The Webster semi-flush mount boasts a classic empire shape with a cone-shaped clear glass shade that offers a minimalist yet sophisticated look. The weathered brass finish adds a vintage touch, making it suitable for traditional, transitional, or industrial-inspired interiors. Its clean lines and timeless design make it a versatile choice for various decor styles.
Designed for indoor use, this fixture is ideal for enhancing lighting in bathrooms, closets, or small hallways. Its semi-flush mount installation allows it to fit comfortably in rooms with standard or lower ceiling heights. The fixture is hardwired and includes a canopy for easy mounting. Compatible with incandescent bulbs and dimmable for adjustable ambiance, it provides reliable, stylish illumination where you need it most.
| Width | 12 inches |
|---|---|
| Height | 10.75 inches |
| Canopy Diameter | 5.00 inches |
| Cord Length | 96.00 inches |
| Shade Shape | Cone |
| Power Source | Hardwire |
| Bulb Type | Incandescent (bulb not included) |
| Base Type | Medium Base |
| Assembly Required | Yes |
| Canopy Included | Yes |
| Dimmable | Yes |
For more details on installation and care, visit our installation guides. To explore matching fixtures, check out our lighting collections.
The Webster semi-flush mount boasts a classic empire shape with a cone-shaped clear glass shade that offers a minimalist yet sophisticated look. The weathered brass finish adds a vintage touch, making it suitable for traditional, transitional, or industrial-inspired interiors. Its clean lines and timeless design make it a versatile choice for various decor styles.
Designed for indoor use, this fixture is ideal for enhancing lighting in bathrooms, closets, or small hallways. Its semi-flush mount installation allows it to fit comfortably in rooms with standard or lower ceiling heights. The fixture is hardwired and includes a canopy for easy mounting. Compatible with incandescent bulbs and dimmable for adjustable ambiance, it provides reliable, stylish illumination where you need it most.
| Width | 12 inches |
|---|---|
| Height | 10.75 inches |
| Canopy Diameter | 5.00 inches |
| Cord Length | 96.00 inches |
| Shade Shape | Cone |
| Power Source | Hardwire |
| Bulb Type | Incandescent (bulb not included) |
| Base Type | Medium Base |
| Assembly Required | Yes |
| Canopy Included | Yes |
| Dimmable | Yes |
For more details on installation and care, visit our installation guides. To explore matching fixtures, check out our lighting collections.